developed a beef-up kit for the side skins (previously covered in a blog post) and a kit to substantially strengthen the landing gear attachment. The kit consists of thicker aluminum and steel plates (shown in the pic at left) which go between the U-shaped bracket (U-1202) and the center section. The T-shaped aluminum piece (T-1204V) on top of the center-section web is a drill guide with two #30 holes, which the builder was to use to match-drill through the web and the steel and aluminum plates below the web (U-1202C-B and U-1202D-B). These #30 holes were then to be enlarged to 1/4 inch. Happily, since I purchased my finish kit in 2016, the U-1202 parts already had the 1/4-inch holes drilled (my experience with match drilling holes has been less than enjoyable). I only needed to drill the holes in the web. The problem was that the holes I drilled in the web had to be perfectly aligned with the already-drilled holes in the other parts. This wasn't an issue with the original beef-up kit since all the holes were drilled together and were automatically aligned. Past experience using thin aluminum sheet with #30 holes as a drill guide showed that it's quite easy to "hog out" the original holes, causing the holes which are supposed to match the original to be off center. I had visions of screwing up the center-section channel, which is the main structural member in the fuselage. These 1/4-inch holes needed to be dead-nuts perfect.
To reduce the chance of misalignment, I ordered additional drill guides from Van's (they're cheap) so I could use stacks of three. This allowed me to use a #30 transfer punch to accurately center punch the hole in the web and reduce the tendency for the #30 drill to walk off center during the drilling of the #30 pilot hole. As instructed in the build manual, I used the reflection of the drill bit in the shiny drill guide to keep the #30 bit perpendicular to the web. I then repeated the process with the 1/4-inch bit.
I won't know how well the holes align until I bolt on the gear.
Hi admin
ReplyDeleteIts extremely impressive, that is the diary you admire I likable it.
As a local home builder I am always interested to hear how people came across my name when searching through the many custom home builders available in their local area.
Best Builder
Best Regards
lillian coleman
Dr. Jerry Hill, you're the man!
ReplyDelete